BUILDING AND INSTALLATION

Sets to 1000 pieces can be made based on the attached e-instructions, over this number of bricks We prefer set assembling by our company at client place.

Sets to 1000 pieces can be made based on the attached e-instructions, over this number of bricks We prefer set assembling by our company at client place.


In conclusion, the estimated time needed for the preparation of the project, the organization of materials, construction showcases, design instructions, create a design and package printing with the installation at the customer place is about three months for model being built with 10k elements, based on idea of ​​the customer. There is no physical opportunity to reduce this time. Usually, with perfect cooperation, models were delivered to the customer in a period of two months.[/vc_column_text]
#BadPirateBUILDING AND INSTALLATION